Artist Rendering, Elevations and Floor Plans
|
|
Interior Photographs
|
 |
Sign
|
|
Marina View
|
|
Lot Prior to Diging Foundation
|
|
|
Bill Discussing the Foundation Plan
|
Crane Lifting Pile
|
|
|
Crane Driving Pile
|
Pile Driven to 40 Feet
|
|
|
Piles
|
Driving Pile
|
|
|
Driving Pile
|
Driving Pile
|
|
|
Bill and Barry Checking That the Foundation Piles Match the Foundation Plan
|
Bill Instructing How to Trim the Foundation Piles
|
|
Foundation Piles Ready for Trimming
|
|
|
Measuring Layout for Foundation Footers
|
Digging Trenches for Footers
|
|
|
Cleaning Trenches Around Piles to Lay Rebar
|
Laying Rebar Around Piles
|
|
|
Rebar, Allthreads and Step Downs Completed
|
Concrete Footers Inplace
|
|
|
Rebar and Allthread
|
Rebar
|
|
Bill Giving Instructions for Pumping Concrete
|
|
|
Ready to Pour Concrete
|
Pouring Concrete
|
|
|
Smoothing Concrete Surface
|
Stepdown used to Save Concrete
|
|
|
Plumbing Rough-in
|
Cinter Block Delivered
|
|
|
Raised Slab Foundation Filled
|
Raised Slab Foundation Filled
|
|
|
Moisture Barrier
|
Concrete Cap Poured
|
|
Ground Floor Framing
|
|
Ground Floor Framing
|
|
Ground Floor Framing
|
|
First Floor Framing
|
|
|
First Floor Framing
|
First Floor Framing
|
|
First Floor Framing
|
|
Second Floor Framing
|
|
Second Floor Framing
|
|
View of the Marina
|
|
Second Floor Framing
|
|
|
Roof Installed
|
Roof Installed
|
|
Windows Installed
|
|
|
Windows Installed
|
Windows Installed
|
|
|
Roofing Installed
|
Roofing Installed
|
|
Roofing Installed
|
|
Door Installed
|
|
|
Sliders
|
Ground Floor Entrance
|
|
|
Hardi Siding
|
Hardi Siding
|
|
|
Decks Trimmed
|
Hardi Siding
|
|
|
Decks Trimmed
|
Painting
|
|
Doors Installed
|
|
|
Painting
|
Stacked Windows
|
|
|
Rear View
|
Marina View
|
|
|
Front View
|
Rear View
|
|
|
Driveway Forms and Stairs
|
Bead Board Ceiling
|
|
|
Driveway Construction
|
Driveway Completed
|
|
Stamped Concrete
|
|
View
|